Rhylthyme ("real time") is a small language and runtime for multi-track schedules where the executor is a person. Several lines of work run in parallel, they share a few scarce resources (one oven, two thermocyclers, one squat rack), and some steps end only when the person says so. A program is plain JSON. Everything else is built around that file: a validator, a timing engine, a live timeline player, an MCP server that lets language-model agents write programs, importers, an R binding, lab-instrument bridges, and native apps.

The <rhylthyme-timeline> player paused at 150 minutes into "Thanksgiving with One Oven": the indefinite roast is hatched, the potato peel waits for the cook to start it, and the Done / Start buttons sit below the chart

What it is

Recipes, protocols and run sheets are "programs for people". Someone writes them for someone else to carry out, and they usually describe one idealized linear process. Existing tools tend to fall into one of three groups. Planners compute a schedule and hand over a static chart. Workflow engines execute a dependency graph on machines, with no person in the loop. Timer apps walk you through a checklist but know nothing about parallel work or shared equipment. Rhylthyme covers the gap between them: capacity-constrained, cross-track schedules that a human follows live.

The program model is small:

  • Tracks are parallel lines of work. Steps within a track run one after another.
  • Steps have a duration. It can be fixed, variable (min/default/max, and the person may end it early) or indefinite (it runs until the person ends it, so planning uses a default).
  • Start triggers relate steps across tracks: programStart, programStartOffset, afterStep (with an optional signed offset, so "peel potatoes 45 minutes before the roast is due out" works), afterStepWithBuffer, manual, on-abort, and all/any combinations.
  • Resource constraints cap concurrent use of a task type (maxConcurrent). An optional environment document declares the resources and actors of a particular kitchen, lab or gym.
  • Newer schema versions add replicates (one step × N instances, with maxInFlight) and step alerts anchored to a step's start or end.

Here is a trimmed version of breakfast_schedule.json from rhylthyme-examples:

{
  "programId": "breakfast-schedule",
  "name": "Breakfast Schedule",
  "environmentType": "kitchen",
  "tracks": [
    { "trackId": "bacon", "name": "Bacon", "steps": [
      { "stepId": "bacon-prep", "name": "Prepare Bacon", "task": "prep-work",
        "startTrigger": { "type": "programStart" },
        "duration": { "type": "fixed", "seconds": 60 } },
      { "stepId": "bacon-cook", "name": "Cook Bacon", "task": "stove-burner",
        "startTrigger": { "type": "afterStep", "stepId": "bacon-prep" },
        "duration": { "type": "variable", "minSeconds": 480,
                      "maxSeconds": 720, "defaultSeconds": 600 },
        "alerts": [{ "event": "end", "offsetSeconds": "-1m",
                     "message": "Check the bacon: pull it as soon as it is crisp" }] }
    ]},
    { "trackId": "toast", "name": "Toast", "steps": [
      { "stepId": "toast-cook", "name": "Make Toast", "task": "toaster",
        "startTrigger": { "type": "programStartOffset", "offsetSeconds": 480 },
        "duration": { "type": "fixed", "seconds": 210 } }
    ]}
  ],
  "resourceConstraints": [
    { "task": "stove-burner", "maxConcurrent": 2 },
    { "task": "prep-work",    "maxConcurrent": 2 },
    { "task": "toaster",      "maxConcurrent": 1 }
  ]
}

From a file like this, the tools report the makespan, the critical chain, peak concurrency and any resource conflicts ("oven needs 2 but max is 1 from 1:45:00 to 2:00:00"). If you give them a finish time, they also produce wall-clock start times for every step.

Architecture overview

flowchart LR
  subgraph Authoring
    H[Person / JSON editor]
    A[LLM agent<br/>Claude, ChatGPT, Cursor]
    I[rhylthyme-importers<br/>recipe sites, CookLang,<br/>protocols.io, Opentrons,<br/>Benchling, Ontime, .pptx]
  end

  S[(Program JSON<br/>rhylthyme-spec<br/>JSON Schema)]

  subgraph Core
    PV[Python validator,<br/>planner, run engine<br/>rhylthyme]
    JE[JS timing engine +<br/>validator / analyzer<br/>@rhylthyme/timeline]
  end

  M[MCP server<br/>mcp.rhylthyme.com<br/>5 endpoints]

  subgraph Clients
    W[Web app + player<br/>rhylthyme.com]
    T[Terminal runner<br/>rhylthyme run]
    N[iOS / macOS / Android<br/>native shells]
    R[R / ggplot2<br/>via V8]
    G[SVG / PNG / PDF<br/>Gantt renders]
  end

  subgraph Instruments
    GA[galago-tools<br/>gRPC drivers]
    LM[LabMCP servers]
  end

  H --> S
  A -->|tool calls| M
  I --> S
  M --> JE
  S --> PV
  S --> JE
  PV -. parity tests .- JE
  JE --> W
  JE --> G
  JE --> R
  W --> N
  M -->|publish| W
  PV --> T
  T -->|workcell| GA
  T -->|workcell| LM
  T -->|analyze / publish| M

Architecture decisions

JSON plus JSON Schema as the language

Decision
A program is a JSON document validated against a versioned JSON Schema published as the rhylthyme-spec package. The schema's constructs carry workflow and OWL-Time ontology annotations. Older and newer schema versions ship together (0.2.0-alpha and 0.3.0-alpha).
Why
Schema-first means every consumer, whether Python, JavaScript, R, Swift or Kotlin, can check the same file without a custom parser. It also gives LLM agents a precise target that a validator can reject.
Trade-off
Hand-writing it is verbose. In practice people rarely write it directly: assistants and importers produce it, and shorthand like "5m" or "1h30m" durations reduces the noise.

One timing engine, embedded everywhere

Decision
Step timing (resolving triggers, offsets, buffers and replicates into start and end times) lives in one zero-dependency JavaScript module, @rhylthyme/timeline. It ships as UMD, ESM and a <rhylthyme-timeline> Web Component. The module was extracted from the web app's timeline-render.js "with no code changes relative to the copy shipped there". The MCP server's validator and schedule analyzer were later moved into the same package.
Why
The web player, the MCP server's PNG previews, static Gantt renders, the R package (through V8) and the macOS app's offline player all compute times with the same code, so they agree to the second. Planning against predicted durations doesn't need a second implementation either: it runs the same resolver over a copy of the program that has the predicted durations substituted in.
Trade-off
The Python rhylthyme-timeline wrapper needs Node.js on the PATH, and the R package and the server carry vendored copies, which have to be kept in step.

Two validators held to parity

Decision
The offline Python CLI (rhylthyme validate) and the JavaScript validator in the engine are independent implementations of the same rules. A CI parity test runs both against every program in rhylthyme-examples, every invalid/<CODE>.json fixture, and systematic mutations (dropped required keys, wrong types, ambiguous oneOf), and fails if any verdict differs. The few deliberate differences are listed by name on both sides.
Why
The CLI has to work with no network and no Node. The hosted server validates in Node, and the program gets checked again when it is published.
Trade-off
Every rule is maintained twice. The parity suite and a shared finding-codes catalogue are what keep that manageable.

An MCP server as the authoring interface

Decision
Agents don't write prose schedules. They make tool calls (validate_program, analyze_schedule, visualize_schedule, import_from_source, catalog search, account tools) against a Model Context Protocol server. One implementation serves five endpoints: generic, kitchen, lab, events and gym. Each vertical adds a few one-shot tools of its own. The server also ships the program schema as MCP resources, plus a four-turn plan_schedule prompt (read the source back, confirm the model, extract steps with source spans, assign tracks and triggers).
Why
The validator refuses malformed programs before they are published, so the agent gets corrected rather than the person. In the preprint's evaluation on 24 expert-authored programs, the four-turn prompt improved step and dependency extraction on all seven models tested. On the four models that ran the full set, the number of programs that both validated and matched the expert's makespan and critical chain went from at most 4 to between 9 and 16. In short, the prompt mattered more than the model.
Trade-off
The server is stateless Streamable HTTP on Vercel, with OAuth 2.1 for account tools. Long operations such as server-side import_text, which makes four or more model calls, are rate-limited per day.

The human is the executor

Decision
Variable and indefinite durations are durations the person controls. Manual triggers are gates the person fires. At run time the engine propagates delays along dependency chains, and it does not re-optimize the schedule.
Why
The aim is a timeline someone can follow at the stove or the bench, not an optimal plan they can't keep up with. The auto-planner (finish together, minimize length, consistent coverage, fit to a target time) runs before execution, not during it.
Trade-off
Rhylthyme has no reactive rescheduling and no optimization layer comparable to RCPSP solvers. It checks feasibility and surfaces conflicts, and leaves the final timing to the person.

Native apps as shells around the web player

Decision
The iOS app (SwiftUI), the macOS app (SwiftUI, built with Swift Package Manager and no Xcode project) and the Android app (Kotlin, Jetpack Compose, Material 3) all host the web timeline in a WebView and talk to it over a JavaScript bridge. Native code handles what the OS does better: Live Activities and AlarmKit alarms on iOS, a foreground service, Quick Settings tiles and full-screen alarms on Android, and a menu-bar timer and Dock controls on the Mac.
Why
There is one player implementation, and the native layer adds only background timing and system integration. The Android port treats iOS as the behavioural source of truth but keeps program JSON lossless, so unknown keys such as replicates survive a round trip.
Trade-off
The bridge is a real protocol, with message handlers, replay of manual actions after a reload, and speed and clock reconciliation. Offline use requires bundling the player: the Mac app ships a copy pinned to a known revision and checked against fixtures.

Importers as a separate, offline package

Decision
rhylthyme-importers uses a BaseImporter with an ImporterRegistry that picks the importer from the URL. It covers TheMealDB, Spoonacular, recipe-scrapers sites, CookLang, protocols.io, Opentrons Protocol API scripts, Benchling, Ontime and PowerPoint decks. Importers that use an LLM (a universal-recipe fallback and free-text import) stay server-side.
Why
An importer reads structure, not meaning, so it can run offline with no API key. Anything that needs a model client, a key and a rate limiter stays out of the base class. An optional --review pass has a model compare the import against the source and report defaulted durations and dropped steps. It doesn't change anything.
Trade-off
Structural imports come out mostly sequential. Parallel tracks and cross-track triggers have to be added by a later enrichment step.

Instrument bridges outside the core

Decision
rhylthyme-galago (Science Corp's galago-tools gRPC drivers) and rhylthyme-labmcp (K-Dense's LabMCP servers) are optional extras (rhylthyme[galago], rhylthyme[labmcp]). A step can name an instrument command. The runner sends it when the step starts, and the step ends when the instrument replies. A local workcell file maps tool roles to addresses and safety limits, and it never leaves the lab machine.
Why
Programs stay portable across labs. galago-tools needs Python 3.9 while Rhylthyme needs 3.12+, so the two talk over gRPC from separate environments. Everything runs simulated unless --live is passed.
Trade-off
It's still alpha, and live runs depend on a pre-flight check of every instrument's identity, mode and limits.

An R binding that reuses the engine

Decision
The R package's read_rhylthyme() times programs with the JavaScript engine embedded through V8, and geom_rhylthyme() / autoplot() draw them with ggplot2. Lanes can be tracks, steps or resources, and run records (what actually happened) plot on the clock time they ran.
Why
This way a plot in a paper or notebook agrees with the website, and there's no Node dependency.
Trade-off
It's one more vendored engine copy to keep current.

Tool stack

Layer Technology Repo
Program language JSON Schema (0.2.0 / 0.3.0-alpha), Python jsonschema rhylthyme-spec
Core library and CLI Python 3.12+, Click, PyYAML; curses runner; pytest, black, isort, flake8, mypy rhylthyme
Timing engine, renderer, player Zero-dependency JavaScript (UMD + ESM), Web Component, hand-written TypeScript types; SVG/PNG/PDF output rhylthyme-timeline
MCP server Node 20+, @modelcontextprotocol/server, mcp-handler, zod, optional @resvg/resvg-js; Vercel, Dockerfile for self-hosting rhylthyme-mcp
Web app Flask (Vercel Python runtime), D3.js, Tailwind, Claude via the Anthropic API for chat; Supabase Postgres with pgvector and pg_trgm for catalog search rhylthyme-server (private)
Importers Python, requests, recipe-scrapers, cooklang-py, python-pptx rhylthyme-importers
R binding ggplot2, V8, jsonvalidate; R-CMD-check in CI; r-universe rhylthyme-r
Lab instruments galago-tools over gRPC; LabMCP over MCP rhylthyme-galago, rhylthyme-labmcp
iOS SwiftUI, WKWebView bridge, ActivityKit Live Activities, AlarmKit, widgets; fastlane rhylthyme-ios (private)
macOS SwiftUI, Swift 6, Swift Package Manager, sandboxed WKWebView, bundled offline player rhylthyme-macos (private)
Android Kotlin, Jetpack Compose, Material 3, supabase-kt, OkHttp, foreground service + Quick Settings tiles rhylthyme-android (private)
Examples and gold set Example programs and environments, invalid fixtures rhylthyme-examples
Docs MkDocs Material, GitHub Actions rhylthyme-docs
CI GitHub Actions: pytest on 3.12/3.13, node --test matrix, JS↔Python parity, schema-bundle and finding-code checks per repo

Screenshots

Dark-theme timeline player

The <rhylthyme-timeline> element in its dark theme. Hatched bars are indefinite steps and red-dashed bars wait for a manual start.

Static Gantt render of a birthday party on a wall-clock axis

A static render from rhylthyme render, working back from a 4:00 pickup, with cross-track dependency arrows.

macOS app timeline view of a bread production batch

The macOS app: three bread lines on a 4.8-hour timeline, with the chat panel on the right.

macOS app dependency graph view

The same program as a dependency graph. Dashed edges carry offsets.

macOS app resources view for a sandwich ELISA protocol

The resources view for a two-day sandwich ELISA adapted from protocols.io, showing peak use against each maxConcurrent.

rhylthyme.com web app home

rhylthyme.com: examples by vertical, the public program catalog, and a Claude-powered assistant that builds programs from plain English.

A shared workout timeline on gym.rhylthyme.com

A share link produced by the MCP server's visualize_schedule: a two-person garage circuit with no equipment double-booked.

Terminal runner driving simulated lab instruments

rhylthyme run with a galago workcell. The shake step stays open until the shaker replies.

iOS app timeline with a running cursor

iOS, running: the cursor, a manual "Complete" action, and playback controls.

iOS itinerary view

iOS itinerary view: the same timings as a list.

iOS Live Activity on the lock screen

A Live Activity on the lock screen, with the manual step completable without unlocking.

Mobile web timeline at 390px

The mobile web layout (390 px): timeline, itinerary and bottom navigation.

Preprint evaluation figure comparing models

From the preprint: single-shot vs. four-turn authoring prompt across seven models.

Rhylthyme documentation site

The documentation site (MkDocs Material).